marty
1st i got to take everything out such as toilet,Single Vanity Sink 2nd rip up and replace sub flooring 3rd replace the Floor Tile. 4th a pice 3ft by 7ft of drywall and finish it. and last exhaust fan cutting the hole and running the wire
